Define
Stage 1
Discovery & requirements
Purpose: Agree on the problem before anyone designs a solution to it.
What happens
- Conversations with the people who will run and use the system.
- Mapping the current workflow — the spreadsheets, paper and tools the system replaces.
- Listing the roles, what each may do, and the edge cases each one meets.
- Separating what the first release must do from what can wait.
What you get
- A written scope: users, roles, core workflows and what is out of scope.
- Open questions listed, each with the person who will answer it.
Working rule
Requirements are written as workflows — who does what, in which order — because those become the API and the screens later.
Stage 2
Planning & architecture
Purpose: Decide how the system is shaped — its data, its boundaries and its stack.
What happens
- Designing the relational data model and the rules it has to enforce.
- Defining the API contracts that web, mobile and desktop clients will share.
- Choosing the stack for the workload — Laravel and MySQL, or Next.js with Prisma and PostgreSQL, for example.
- Identifying integrations early: payments, notifications, messaging, media storage.
What you get
- A data model and an outline of the API.
- Technology choices, each with the reason for it.
- A delivery plan broken into milestones.
Working rule
Permissions and tenant boundaries are designed into the data model from the start, not bolted on after the screens exist.
Stage 3
UI/UX & system design
Purpose: Design each role's work before building the screens for it.
What happens
- Mapping each role's main flows from start to finish.
- Structuring dashboards, forms and data-heavy tables so they stay readable.
- Designing Arabic and English layouts together — right-to-left is a layout, not a translation.
- Designing empty, loading and error states alongside the main path.
What you get
- Flows and screen structure the build follows.
- An agreed set of interface components.
Working rule
Screens are designed against the shape of the data, so what the interface promises is something the back end can deliver.
Build
Stage 4
Development & integration
Purpose: Build in slices that work end to end, not layers that meet at the end.
What happens
- Back end: business rules in services, validated input and authorization policies.
- Front end: typed React and Next.js interfaces built against the agreed API.
- Mobile and desktop clients on the same API as the web, so every client reads one source of truth.
- Third-party services wired in through thin adapters, so they can be replaced.
What you get
- Working features the client can review as they land.
- Code in Git with a history that can be reviewed.
Working rule
A feature is finished when its permissions, validation and error states are — not when its main screen renders.
Stage 5
Testing & QA
Purpose: Prove the core scenarios work before real users depend on them.
What happens
- Automated tests for business rules — PHPUnit on Laravel back ends.
- Static analysis and formatting checks — PHPStan and Laravel Pint.
- API behaviour checked in Postman before a client is wired to it.
- A security pass: authentication, permissions, validation and rate limiting.
- Manual runs through every role's main flows, in both languages.
What you get
- A release candidate with the core scenarios verified.
- Known issues written down, not hidden.
Working rule
A failing check is fixed or reported — never silenced to make a release look green.
Run
Stage 6
Deployment & delivery
Purpose: Put the system in production in a way someone else can operate.
What happens
- Production setup — Nginx and PHP-FPM on a Linux VPS, or Docker with PostgreSQL, depending on the system.
- Configuration scoped per environment, with no secrets in the source code.
- CI workflows with GitHub Actions where the project uses them.
- Health checks, backups and a written rollback procedure.
- Handover documentation for the people who will run the system.
What you get
- The system running in production.
- Access and documentation handed over.
Working rule
Every release has a way back: a rollback path is written before the deploy, not improvised after it.
Stage 7
Maintenance & scaling
Purpose: Keep the system healthy, and grow it without rewriting what works.
What happens
- Fixes and small improvements under an agreed arrangement.
- New modules built on the existing data model and API.
- Performance work as the data grows: queries, indexes and caching.
- Dependency and security updates.
What you get
- A maintained system with a written record of what changed and why.
Working rule
Maintenance is its own, explicitly scoped agreement — not an open-ended promise folded into the build.
Expectations
What this page does not promise
A process is not a quote. These are the parts that depend on your project.
No fixed timelines
How long each stage takes depends on scope. Estimates come after discovery, not before it.
No list prices
Development work is quoted per project, once the scope is written down.
No online payment yet
Requests start with a message. Fees, deposits and payment are agreed directly — nothing is charged through this site.
Maintenance is separate
Support after delivery is its own agreement with its own scope, not an open-ended part of the build.
Start with discovery
Describe the system and the people who will use it. I’ll reply with questions or a proposed next step.
